Renergia waste incineration plant

The waste incineration plant (WIP) in Perlen is an important energy supplier in central Switzerland. As a WIP specialist, CALIQUA AG replaced the turbine during the ongoing operation of the plant.
140
tonnes of live steam per hour
33050
kilowatts of turbine output
200000
MWh of electricity produced by the plant
30000
households can be supplied with electricity from the plant
140
tonnes of live steam per hour
33050
kilowatts of turbine output
200000
MWh of electricity produced by the plant
30000
households can be supplied with electricity from the plant

New turbine for the waste incineration plant

The WIP belonging to Renergia Zentralschweiz AG has been in operation since 2015 and acts as the central waste incineration facility in the region. The plant incinerates over 280,000 tonnes of waste annually and produces almost 200,000 MWh of electricity from it, among other products. This is enough to supply approx. 30,000 households, roughly equivalent to the size of the city of Lucerne.

CALIQUA Services

  • CALIQUA handled the delivery and installation of a steam turbine and a gearbox. Both were installed on the existing base frame and coupled with the existing generator.
  • CALIQUA also provided the detailed engineering for integration into the existing plant and adapted all connecting pipelines, as well as the electrical and control technology. All this was done without interrupting the operation of the existing plant

Customer Benefits

Renergia benefited from obtaining all services from a single source. As CALIQUA had already supplied the previous turbine and the complete thermal plant, everyone involved in the project had the necessary detailed knowledge.

Challenges

The project had a tight time frame: the old turbine and gearbox had to be dismantled, and the new turbine and gearbox installed, within nine days. Within this period, the turbine and gearbox also had to be connected both electrically and mechanically and the entire plant brought back online. This was only possible because all the work was planned in advance and a detailed plan was created for every task.

Technical data

The turbine is an extraction condensing turbine with LP extraction. It has the following technical data:

  • Speed: 5,700 rpm
  • Power: 33,050 kW
  • Live steam: 140 t/h at 40.5 bar and 420°C
  • Extraction steam: 0–131.5 t/h at 4.7 bar and 160°C
  • Bleeder steam: 0–7.5 t/h at 0.44–1.02 bar
  • Waste steam: 8.5–140 t/h at 0.06–0.16 bar

The gearbox has double helical gearing and a capacity of 34,000 kW.

"We deliberately chose a partner who would actively contribute their ideas and thereby advance the project. The contractor option from CALIQUA promised the highest energy efficiency and thus got the most energy out of the waste"
Ruedi Kummer CEO of Renergia Zentralschweiz AG

About Renergia Zentralschweiz AG

Renergia Zentralschweiz AG was founded in 2012. As a WIP, the plant incinerates the waste of central Switzerland, supplies Perlen Papier AG with process steam, the Rontal and Emmen/Lucerne district heating networks with hot water, and thousands of households with electricity, making it the largest power plant in the canton of Lucerne. The company has roughly 30 employees.